Vous cherchez une publication ?
< All Topics
Print

Revues

  • Bahria, N., Dridi, I.H. Chelbi, A., and Bouchriha, H (2020): Joint Design of Control Chart. Production and Maintenance policy for unreliable manufacturing systems. Journal of Quality in Maintenance Engineering. Vol. 27, Issue 4. DOI 10.1108/JQME-01-2020-0006
  • Amir Baklouti, Lahcen Mifdal, Sofiene Dellagi, Anis Chelbi(2020) : An optimal preventive maintenance policy for a solar photovoltaic system. J. Sustainability, 2020, 12(10), 4266; https://doi.org/doi:10.3390/su12104266
  • Amel Ben Mabrouk, Anis Chelbi, Lazher Tlili & Mehdi Radhoui (2019): A quasi optimal inspection strategy for leased equipment, International Journal of Production Research. 58(3), pp. 878–892. https://doi.org/10.1080/00207543.2019.1602743
  • Zied Hajej, Nidhal Rezg, Anis Chelbi & Maryem Bouzoubaa (2019): An optimal integrated Production and Maintenance strategy for a multi-wind turbines system, International Journal of Production Research. https://doi.org/10.1080/00207543.2019.1680897
  • Jérémie Schutz, Anis Chelbi, Nidhal Rezg, Safa Ben Salem, (2019): Production and maintenance strategies for parallel machines with load transfer in case of failure, Journal of Quality in Maintenance Engineering, https://doi.org/10.1108/JQME-07-2017-0049
  • Bahria, N., Chelbi, A., Dridi, I.H. and Bouchriha, H (2018): Integrated production, statistical process control, and maintenance policy for unreliable manufacturing systems. International Journal of Production Research. http://dx.doi.org/10.1080/00207543.2018.1530472
  • Mohamed N. Darghouth, Anis Chelbi, (2018) A decision model for warranted second-hand products considering upgrade level, past age, preventive maintenance and sales volume, Journal of Quality in Maintenance Engineering, Vol. 24 Issue: 4, pp.544-558,
  • Bahria, N., Chelbi, A., Dridi, I.H. and Bouchriha, H. (2018) Maintenance and quality control integrated strategy for manufacturing systems’, European J. Industrial Engineering, Vol. 12, No. 3, pp.307–331.
  • Jbili, S., Chelbi, A., Radhoui M., Kessentini M., (2018).  Integrated Vehicle Routing and Maintenance Strategy. Journal of Reliability Engineering and System Safety. Vol 170 pp 202-214. https://doi.org/10.1016/j.ress.2017.09.030.
  • Darghouth, M.N.,  Ait-Kadi, D,Chelbi, A., 2017. Joint optimization of design, warranty and price for products sold with maintenance service contracts. Journal of Reliability Engineering and System Safety. Vol 165 pp 197-208.  http://dx.doi.org/10.1016/j.ress.2017.03.033
  • Dellagi, S., Chelbi, A., Trabelsi W., 2017: Joint integrated production-maintenance policy with production plan smoothing through production rate controlJournal of Manufacturing Systems. Vol 42, pp 262-270. http://dx.doi.org/10.1016/j.jmsy.2016.12.013
  • Darghouth, M.N., Chelbi, A., Ait-Kadi D., 2017: Investigating Reliability Improvement of Second-Hand Production Equipment Considering Warranty and Preventive Maintenance Strategies. International Journal of Production Research. http://dx.doi.org/10.1080/00207543.2016.1277277
  • Tlili L, Radhoui M, Chelbi A., 2016: Optimal periodic inspection policy for systems generating environmental damage over a finite time horizon. Journal of Quality in Maintenance Engineering (JQME), Volume 22, Issue 4, pp 453 – 467.
  • Ben Mabrouk, A., Chelbi, A., Radhoui, M., 2016. Optimal imperfect maintenance strategy for leased equipment. International Journal of  Production Economics, N° 178, pp 57-64.
  • Ben Mabrouk, A., Chelbi, A., Radhoui, M., 2016. Optimal imperfect preventive maintenance policy for equipment leased during successive periods. International Journal of  Production Research, http://dx.doi.org/10.1080/00207543.2016.1146417
  • Darghouth, M.N., Ait-Kadi D., Chelbi, A., 2016: Joint Reliability Based Design and Preventive Maintenance policy for Systems Sold with Warranty. Journal of Quality in Maintenance Engineering (JQME), Vol. 22, No. 1, p 2-17. http://dx.doi.org/10.1108/JQME-12-2014-0060
  • Tlili L, Radhoui M, Chelbi A., 2015: Condition-Based maintenance strategy for production systems generating environmental damage. Journal of Mathematical Problems in Engineering, Vol. 2015. 
  • Maaroufi G, Chelbi A., Rezg N, Ait-Kadi D., 2015: A nearly optimal inspection strategy for a two component series system. Journal of Quality in Maintenance Engineering (JQME), Volume 21, Issue 2.
  • Maaroufi G, Chelbi A., Rezg N. 2013: Optimal selective renewal policy for systems subject to propagated failures with global effect and failure isolation phenomena. Reliability Engineering and System Safety.  Volume 114, June 2013, Pages 61–70.  http://dx.doi.org/10.1016/j.ress.2012.12.019
  • Slah Samet, Chelbi A, Fayçal Ben Hmida 2012: Optimal preventive maintenance strategy using two repair crews having different efficiencies: a quasi renewal process based modelling approach, International Journal of Production Research, (2012), 50(13): 3621 – 3629. DOI:10.1080/00207543.2012.671591
  • Dahane M, Rezg N, Chelbi A, 2012: Optimal production plan for a multi-products manufacturing system with production rate dependent failure rate. International Journal of Production Research, (2012), 50(13): 3517 – 3528.  DOI: 10.1080/00207543.2012.671585  
  • Darghouth, M.N., Chelbi, A., Ait-Kadi D., 2012 A profit assessment model for equipment inspection and replacement under renewing free replacement warranty policy. International Journal of Production Economics, 135(2): 899 – 906.
  • Bouguerra, S., Chelbi, A., Rezg N., (2012) A decision model for adopting an extended warranty under different maintenance policies. International Journal of Production Economics, 135(2): 840 – 849. doi:10.1016/j.ijpe.2011.10.022
  • Diallo, C., Ait-Kadi D., Chelbi, A., (2012) A Review of Spare Parts Management Models for Multicomponent Repairable SystemFrontiers of Environmental Science & Engineering in China. 01/2012; 2(1).
  • Yedes Y.,Chelbi, A., Rezg, N., 2011 Quasi-optimal integrated production, inventory and maintenance policies for a single-vendor single-buyer system with imperfect production process. Journal of Intelligent Manufacturing, Springer®. DOI: 10.1007/s10845-010-0423-2.
  • Benmansour R, Artiba A, Chelbi A., Allaoui H., 2010, Application de l’AMDEC pour l’amélioration de la maintenance d’une machine d’usinage intégral. Revue Française de Gestion Industrielle, Vol. 29, No. 4, p. 81-96.
  • Mehdi, R., Chelbi ARezg N., 2010, Integrated maintenance and control policy based on quality control. Journal of Computers & Industrial Engineering, DOI:10.1016/j.cie.2009.11.002. Volume 58, issue 3, pp. 443 – 451.
  • Samet S., Chelbi A., Ben Hmida F., 2010, Optimal availability of failure prone systems under imperfect maintenance actions, Journal of Quality in Maintenance Engineering (JQME). Volume 16, issue 4.
  • Ben Hmida F., Samet S. et Chelbi A., 2010, Estimation itérative des paramètres d’un processus de quasi renouvellement. Cas d’une distribution de Weibull. Journal Européen des Systèmes Automatisés (JESA). Volume 44 – Issue 3/2010 pp 303-326.

 

  • Chelbi A., Rezg N., Radhoui M., Simultaneous determination of production lot size and preventive maintenance schedule for unreliable production system producing conforming and nonconforming units.  Journal of Quality in Maintenance Engineering, Emerald®, Vol. 14, N°2,  pp.161-176, 2008. Article primé : Outstanding Paper Award Winner at the Literati Network Awards for Excellence 2009
  • Chelbi A., Ait-Kadi D., Aloui H., Optimal inspection and preventive maintenance policy for systems with self-announcing and non-self-announcing failures. Journal of Quality in Maintenance Engineering, Emerald®.  Vol. 14, N°1,  pp. 34-45, 2008.
  • Boschian V., Rezg N., Chelbi A., Contribution of simulation to the optimization of maintenance strategies for a randomly failing production system. European Journal of Operational Research. Elsevier®. Volume 197, Issue 3, Septembre 2009, pp. 1142-1149. DOI:10.1016/j.ejor.2008.03.037,
  • Rezg N, Dellagi S, Chelbi A., Joint Optimal Inventory Control and Preventive Maintenance Policy. International Journal of Production Research, Taylor & Francis®, Vol.46, Issue 19, pp 5349 -5365, 2008.
  • Diallo, C., Ait-Kadi D, Chelbi A., (s,Q) spare parts provisioning strategy for periodically replaced systems. IEEE Transactions on Reliability, Vol. 57, N°1, pp. 134-139, ISSN 0018-9529, mars 2008.
  • Radhoui M., Rezg N, Chelbi A., Integrated model of preventive maintenance, quality control and buffer sizing for unreliable and imperfect production systems. International Journal of Production Research, Taylor & Francis®, Vol. 47, Issue 2, pp. 389-402, January 2009.
  • Chelbi A., Ait-Kadi D, Radhoui M., An integrated production and maintenance model for one failure prone machine-finite capacity buffer system for perishable products with constant demand. International Journal of Production Research, Taylor & Francis®, Vol.46, Issue 19, pp 5427 -5440, 2008.
  • Yedes Y.,Chelbi, A., Rezg, N., Choosing between two single vendor single buyer integrated production inventory strategies. Journal of Operations and Logistics,  Vol. 2, Issue 4, 2009.
  • Samet S., Chelbi A., Ben Hmida F., Repairable Systems Availability optimization under  imperfect maintenance. Bulletin of the Polish Academy of Sciences, Volume 57, Issue 3, pp: 249-256, 2009
  • Chelbi A., Rezg N., Analysis of a production/inventory system with randomly failing production unit subjected to a minimum required availability level.  International Journal of Production Economics, Elsevier®. Vol. 99, pp. 131-143, 2006.
  • Boschian V., Rezg N., Chelbi A., Stratégie de commande globale intégrant la maintenance et la non-conformité des produits, Journal européen des systèmes automatisés, Hermés®, Vol.40 – No 7/2006, pp 787-809, 2006.
  • Rezg N., Chelbi A., Xiaolan X, Modeling and optimizing a joint buffer inventory and preventive maintenance strategy for a randomly failing production unit: Analytical and simulation approaches. International Journal of Computer Integrated Manufacturing, Vol 18, No 2-3, pp 225-235, May 2005.
  • Chelbi A., Ait-Kadi D., Analysis of a production/inventory system with randomly failing production unit submitted to regular preventive maintenance. European Journal of Operational Research, 2004, vol 156/3, pp 712-718.
  • Ait-Kadi D., Souad H., Benchekroun B., Chelbi A., Stratégie de maintenance pour la maximisation d’un système de production.  Journal européen des systèmes automatisés. 2003, Vol. 37/5 pp 607-619.
  • Ait-Kadi D., Claver D.,Chelbi A., Spare Parts Identification and Provisioning Models.  Journal of Decision Systems, 2003, vol .12/1, pp 47-65.
  • Chelbi A., Ait-Kadi D., Joint Optimal Buffer Inventory and Preventive Maintenance Strategy for a Randomly Failing Production Unit.  Journal of Decision Systems,  2003, vol 12/1, pp 21-30.
  • Chelbi A., Ait-Kadi D., Classement des équipements par ordre de priorité pour la maintenance : une approche multicritère, Journal of Decision Systems, Vol 11, Nº 1, pp 91-108, 2002.
  • Chelbi A., Ait-Kadi D., Spare Provisioning Strategy for Preventively Replaced Systems Subjected to Random Failure. International Journal of Production Economics,.  Vol. 74, 1-3, pp-183-189, 2001.
  • Chelbi A., Ait-Kadi D., Generalized Inspection Strategy for Randomly Failing Systems Subjected to Random Shocks, International Journal of Production Economics, Vol. 64, pp-379-384, 2000.
  • Chelbi A., Ait-Kadi D., Block Replacement Policy for Non Self-Announcing Failure Equipment, , International Journal of Mechanical Production Systems Engineering, Vol III, pp V-27,V-34, 2000.
Table of Contents